Alter Center Kreuzlingen

Project information

Client: Alterszentrum Kreuzlingen

Industry: Healthcare

Type of construction: Capital modular construction

Implementation period: 4 months

Year of construction: 2011

Architect: DMBAU AG

Area (m²): 837 m²

Location: Kreuzlingen

General contract

Alterzentrum Kreuzlingen needed temporary accommodation for residents while its residential building was being renovated. A three-story building was constructed in three months using modular construction technology.

Residents gained a modern level of comfort and were able to remain in close proximity to their familiar social environment.

The building contains 13 apartments: eleven 2.5-room apartments and two 3.5-room apartments that meet modern requirements for residential real estate.

Key features of the project

  • High standard of finish
  • Possibility of dismantling with reuse
  • Ensuring uninterrupted operation of the facility during construction