Grabs Hospital — MRI 2
To meet the growing demand for diagnostic examinations, DMBAU implemented a temporary building for outpatient MRI examinations for Spital Grabs within a short time frame.
The project was completed in less than five months—from planning and ordering materials to manufacturing modules in Oberriet, delivery, and installation. The high level of factory readiness, including interior finishing, facade, and painting, was decisive, allowing the building to be assembled on site in one day during unfavorable weather conditions (January/February).
Key features of the project
- Use of Siemens Magnetom Aera 1.5 Tesla MRI
- High level of factory readiness (interior finishing, facade, painting)
- 3 months from signing the contract to delivery to the customer
- Construction without interrupting hospital operations
- Extremely short installation time on site
- Installation of modern engineering systems (heating, ventilation, air conditioning, sanitation)