SUVA Rehabilitation Clinic in Bellikon
As part of the large-scale modernization program of SUVA Rehaklinik Bellikon, with a budget exceeding 300 million, it was necessary to implement a temporary building to relocate some of the therapeutic, administrative, and training facilities.
Despite the temporary nature of the building, special attention was paid to the quality of workmanship and user comfort during the interior design. The premises meet modern requirements for functionality and ergonomics, so patients and staff do not experience any restrictions in their usual level of comfort.
The exterior of the building is clad in white profiled metal, which allowed the temporary structure to be harmoniously integrated into the existing architectural ensemble of the clinic.
Key features:
- Compliance with strict safety standards and SUVA environmental requirements
- Continuous operation of the clinic during the installation of the temporary building
- The possibility of dismantling and reusing the structure as part of a sustainable approach

