EPC-CPLN Professional Training Center, Neuenburg
Regardless of whether premises are needed temporarily or permanently, the key factor is often the commissioning date. Students at the Neuenburg High School were able to move into the new 2,194 m² two-story school building in November 2010, even though the contract was only signed in mid-June 2010.
The building was used during the three-year renovation of the main campus. After this period, it was dismantled and installed in Payerne for further use as a teaching building. During reassembly, additional requirements were taken into account, including the installation of an elevator, new sanitary facilities, and kitchen units.
Key features of the project
- Glass canopy
- Short construction period
- Dismantling and reuse in another location