Private international educational institution in Gümligen

Project information

Client: ISB International School of Berne

Industry: Education

Type of construction: Capital modular construction

Implementation period: 2.5 months

Year of construction: 2007

Architect: Mr. Sven Stucki, Dipl. Architekt ETH SIA

Area (m²): 550 m²

Location: Gümligen

General contract

The building was constructed on an existing parking lot. During implementation, key structural elements were installed within two days, which allowed the educational process to continue virtually uninterrupted.

The interior work took approximately four and a half weeks. The facility complies with fire safety requirements and has open, aesthetically designed rooms. A high standard of finish has been achieved for a temporary building.

Key features of the project

  • Underfloor heating
  • Possibility of dismantling with reuse