DM BAU logo (when scrolling)

Spital Zollikerberg Hospital

Project information

Client: Spital Zollikerberg

Industry: Healthcare

Type of construction: Capital modular construction

Implementation period: 5 months

Year of construction: 2009

Architect: W. Dietsche Baumanagement AG

Area (m²): 2,075 m²

Location: Zollikerberg

General contract

The temporary DMBAU building, constructed using capital modular construction technology, known as the "garden building," ensured the hospital's continued operation during the implementation of several reconstruction and new construction projects.

The hospital management sought to minimize the impact of construction work on patients. The rooms in the garden wing met Spital Zollikerberg's usual high standards of quality and aesthetics. Particular attention was paid to the materials used, thermal insulation performance, and the installation of an elevator for hospital beds.

The two-story building is connected to the main hospital building by a passageway.

Key features of the project

  • High standard of quality and aesthetics
  • Transition to the existing building
  • Possibility of dismantling with reuse