Construction of a new MRI station at Clinica Santa Chiara

Project information

Client: Clinica Santa Chiara SA

Industry: Healthcare

Type of construction: Construction from solid modular elements

Implementation period: 6 months

Year of construction: 2018

Architect: Saverio Wezel SAGL

Area (m²): 209

Location: Locarno

Implementation of the project as a general contractor

Key features

  • Increased load on the floor in the MRI room (10 kN)
  • Complicated logistical conditions (Gotthard Tunnel)
  • Durable Rockpanel facade cladding
  • Extension on a steel structure