Temporary ward building Valens

Project information

Client: Kliniken Valens

Industry: Healthcare

Type of construction: Capital modular construction

Implementation period: 3 months

Year of construction: 2023

Architect: Mayer Architektur AG

Area (m²): 1,414 m²

Location: 7317 Valens

Features: General contracting

As part of the plans to renovate the Valens rehabilitation center, a temporary ward building was constructed. The building was erected on site within three months with minimal disruption to the facility's operations.

Thanks to the high level of factory readiness, 22 fully equipped sanitary modules were installed at the Oberriet production facility, ensuring efficient installation. Despite the challenging logistics conditions due to the geographical location and transport route, the delivery of the large modules was completed on time without significantly impacting the residents of the settlement.

The building includes 12 single rooms and 10 triple rooms, as well as staff rooms. It is connected to the existing building by two passageways in both wings. The building allows for full treatment and care of patients during the reconstruction of the main building.

Key features of the project

  1. 1,414 m²
  2. 12 single rooms and 10 triple rooms
  3. 22 ready-made sanitary modules
  4. Complex geographical and logistical delivery conditions