Allmend temporary school building, Stadt Bülach

Project information

Client: City of Bülach

Industry: Education

Type of construction: Capital modular construction

Implementation period: 5 months / 4 months

Year of construction: 2019 / 2020

Architect: arch5 GmbH

Area (m²): 336 m² / 673 m²

Location: Bülach

General contract

The temporary educational building was constructed in 2019 and expanded in 2020.

Key features of the project

  • Factory readiness level — 70%
  • Engineering systems pre-installed
  • Cooperation with subcontractors
  • A three-story building was created from a single-story building.
  • Classrooms for kindergarten and elementary school
  • The superstructure was implemented in the summer of 2021.
  • Energy standard according to MuKEn 2014
  • Planned service life — approximately 5–8 years