DM BAU logo (when scrolling)

Geistlich Pharma AG laboratory building

Project information

Client: Geistlich Pharma AG

Industry: Healthcare

Type of construction: Capital modular construction

Implementation period: 2006: 4 months, 2010: 5 months

Year of construction: 2006, expansion — 2010

Architect: Sales Blum Bautreuhand AG

Area (m²): 610 m²

Location: Wolhausen

General contract

Geistlich Pharma AG in Wolhusen is implementing an expansion program. The company has been working with us since 2004, using hybrid technology for the continuous operation of its buildings.

The first extension was completed in 2006. Further work was carried out in 2007 and 2008 (extension). In 2010, another laboratory building was added to the campus.

Thanks to capital modular construction technology, the research center in Wolhusen received a new building in a short period of time with a level of finish that meets the requirements of a pharmaceutical company.

Key features of the project

  • Engineering systems (heating and cooling via ceiling panels)
  • Bridge of engineering networks
  • Possibility of further expansion (building constructed in 2006 with extensions, the last one in 2010)