Buser-Arena clubhouse, Grenchen
The project includes three building units: a clubhouse, a changing room, and a shooting tower.
The two-story clubhouse is equipped with stairs and an elevator, and also has a semi-covered terrace. The factory readiness level is 75%, including pre-installed engineering systems.
The façade is made of Rockpanel panels in a gray tone with a marble-like wood texture, which blends harmoniously with the surrounding environment. Acoustic ceilings made of natural oak have been installed on both floors. The building complies with the MuKEn 2014 energy standard.
Key features of the project
- 75% factory-ready with pre-installed engineering systems
- 3 building units (clubhouse, changing room, shooting tower)
- Two-story building with elevator and semi-covered terrace
- Rockpanel facade with wood texture
- Acoustic ceilings made of natural oak
- MuKEn 2014 energy standard

