UAPE Gland Children's Center

Project information

Client: Municipality of Gland

Industry: Public facilities

Type of construction: Capital modular construction

Implementation period: 6 months

Year of construction: 2012

Architect: Kunik de Morsier architectes SIA

Area (sq m): 1,184 sq m

Location: 1196 Gland

General contract

Due to the growing population of the Gland community, the demand for spots in childcare facilities has increased. The use of prefabricated modular construction technology made it possible to complete the project on a tight schedule while maintaining high standards of durability.

The modules were installed within seven days, minimizing construction noise. The two-story building is designed to allow for the addition of another floor without requiring major structural modifications.

Key features of the project

  1. Dining room with kitchen
  2. Expandability
  3. Facade with Rockpanel
  4. Light color scheme
  5. High-quality building materials